FOUNDATIONS

PERMANENT FORMWORK, CONCRETING, REINFORCEMENT AND CROPPING OF PILES

Every construction project must start off in the correct way if it is to have any chance of being a success and this involves getting the foundations of the building installed on time, to cost and with no accidents. As a company, Constructicon Limited, has profound knowledge and experience in the installation of all types of foundation designs. This task may involve the cropping of piles of varying diameters, which can include pre-cast concrete, in-situ concrete or steel.

As a company who is dedicated to reducing Hand Arm Vibration on sites, we ensure that the cropping of these units is undertaken with the correct machine attachment for the appropriately sized excavator. Our committed workforce also makes light work of installing the specified reinforcement to any concrete structure. We can ensure that the final reinforced structure will be 100% reflective of the design provided within the steel schedule or engineers drawing. Constructicon’s workforce has vast experience in the installation of permanent formwork such as pecafil and corriform, to create the planned ground beam and pile cap construction.

Once all preparation works have been completed, in-situ concrete will be introduced to the foundation , which is usually completed with the assistance of an excavator or concrete pump facilitating for anything up to 200m3 of concrete to be poured in a standard day.

 

Memberships & Accreditations