Scope of works

  • Over 200t of reinforcement fixed within foundations, floor slabs and ancillary buildings.
  • 185 drainage completion.
  • Cropping and waterproof treatment of concrete piles
  • Installation of an 8000 litre backwash tank 7 metres below ground level.
  • Installation of a Viacon attenuation tank.
  • Shotcreting to seacant piles.
  • Gas / Waterproof membrane works.
  • Installation of one sided Walls.
  • Formwork and concrete to plinths, substation and associated buildings.