Scope of works
- Over 200t of reinforcement fixed within foundations, floor slabs and ancillary buildings.
- 185 drainage completion.
- Cropping and waterproof treatment of concrete piles
- Installation of an 8000 litre backwash tank 7 metres below ground level.
- Installation of a Viacon attenuation tank.
- Shotcreting to seacant piles.
- Gas / Waterproof membrane works.
- Installation of one sided Walls.
- Formwork and concrete to plinths, substation and associated buildings.