The new 58,000 ft building comprised of a new surgical block, housing four operating theatres, two 28-bed wards and an admissions unit.

Scope of works

  • Excavation and installation of over 1000m3 of concrete into mass filled foundations.
  • Installation of 1200mm diameter concrete pipes to act as a surface water attenuation in addition to 2400mm diameter manholes inclusive of flow control units.
  • Installation of over 1,000 metres of clay drainage.
  • Installation of gas membrane to entire ground floor slab with independent validation.
  • Installation of concrete service yards.
  • Installation of hard landscaped to isolated internal courtyards.